Inverter
The inverter converts the panels’ DC electricity into usable AC power. Compare the exact make and model, rated output, phase compatibility, protection features, monitoring method, warranty and local service arrangements.
For a hybrid system, ask how the inverter handles battery charging, grid charging, backup output and load priority. Confirm that the proposed battery chemistry and capacity are supported by that exact inverter model.
Mounting structure and electrical protection
A complete quotation should identify the mounting structure, fasteners, DC and AC cables, junction and distribution boxes, earthing, lightning protection, surge protection, isolators and meter-related work. MNRE’s technical specifications cover these components; they are not optional decorative extras.
Ask how the installer will protect the roof from water ingress, how the structure is designed for local wind conditions and how technicians will safely access panels for cleaning and repair.
4. PM Surya Ghar subsidy: what residential buyers should know
The PM Surya Ghar: Muft Bijli Yojana guidelines published by the Ministry of New and Renewable Energy state that the scheme implementation period runs through 31 March 2027. The published Central Financial Assistance (CFA) structure for eligible residential consumers is:
| Eligible residential capacity | General states | Special-category states/UTs |
|---|
| First 2 kWp, or part thereof | ₹30,000 per kWp | ₹33,000 per kWp |
| Additional 1 kWp, or part thereof | ₹18,000 per kWp | ₹19,800 per kWp |
| Capacity beyond 3 kWp | No additional CFA | No additional CFA |
| Maximum central CFA for an individual residential system | ₹78,000 | ₹85,800 |
The special-category list in the guidelines includes specified Himalayan, north-eastern and island states/UTs. Check the official scheme document for the exact list and your eligibility.
Illustration: Under the published general-state structure, a qualifying 2 kWp residential system corresponds to ₹60,000 CFA, while a 3 kWp system corresponds to ₹78,000. These are scheme calculations, not a promise that every applicant or installation will receive that amount.
Key conditions matter:
- The CFA component applies to eligible residential grid-connected rooftop solar installations under the capex mode. Commercial and industrial connections are not covered by this residential CFA component.
- The system must meet the scheme’s technical requirements and the DCR module condition.
- Apply through the official National Portal and select a vendor registered on that portal.
- The DISCOM must inspect and verify the installation and complete the portal process before CFA is processed.
- Off-grid installations are not eligible for this CFA. Certain grid-connected battery-hybrid or behind-the-meter arrangements may be considered only where the relevant State Electricity Regulatory Commission and DISCOM approvals permit them.
- State governments may provide additional support, but any state-level benefit must be checked separately on the official portal and under the applicable state rules.
The scheme’s purpose includes helping households obtain up to 300 units of electricity per month, but that is not a guaranteed monthly output for every roof. Actual generation and bill savings depend on the installed capacity, sunlight, consumption pattern and local metering rules.
5. Net metering is not the same everywhere
With an approved export arrangement, surplus electricity may be sent to the grid and credited according to the applicable state framework. The settlement can involve net metering, gross metering, net billing or another approved arrangement.
Before signing, ask your DISCOM or installer to confirm in writing:
- Which metering arrangement applies to your connection.
- How exported units are valued or adjusted.
- Whether credits expire, carry forward or are settled at a different rate.
- Whether fixed charges, demand charges or other bill components remain payable.
- Whether your sanctioned load or connection phase needs an update.
Do not calculate savings by assuming that every unit exported to the grid offsets a unit imported at the same retail tariff. The applicable State Electricity Regulatory Commission rules and your DISCOM’s current process decide the settlement.
6. A new inverter-data requirement buyers should ask about
An MNRE Office Memorandum dated 17 August 2026 adds an important compliance point for inverter systems installed under PM Surya Ghar. It directs inverter manufacturers/OEMs to ensure that associated applications, monitoring and control servers, and real-time system data—including cloud-hosted data—reside in an encrypted, secure environment exclusively within India. It also says data-logger warranty must be included as part of the inverter warranty.
When comparing quotations, ask the vendor to identify the exact inverter OEM and model and provide the manufacturer’s written compliance confirmation. Ask how generation data is sent to the National Portal and whether the data logger is covered by the inverter warranty. Do not rely only on a generic statement that the mobile app is “cloud enabled”.
7. Compare quotations line by line
Get at least two or three itemised quotations for the same proposed capacity and system type. Compare the following:
| Quotation item | What should be stated clearly |
|---|
| Panels | Manufacturer, exact model, number of modules, wattage, DCR eligibility and warranties |
| Inverter | Manufacturer, model, rated AC output, phase, protection, monitoring and warranty |
| Battery, if included | Chemistry, usable capacity, power rating, warranty and backup circuits |
| Structure | Material, corrosion protection, roof fixing method and wind-load design |
| Electrical protection | Earthing, lightning and surge protection, isolators, AC/DC boxes and cable specifications |
| Metering | Net meter or other approved arrangement, DISCOM charges and who handles the paperwork |
| Installation | Labour, transport, roof work, waterproofing and commissioning |
| Maintenance | Comprehensive maintenance contract, service response and exclusions |
| Total cost | GST, approvals, meter charges, optional accessories and any excluded work |
For eligible PM Surya Ghar installations, the published guidelines require registered vendors to provide a five-year comprehensive maintenance contract from commissioning. Read the actual agreement and confirm what is covered, how complaints are raised and whether travel or consumables are excluded.
8. Common mistakes to avoid
- Buying a system based only on the number of panels or a low per-kW quote.
- Assuming on-grid solar provides backup during power cuts.
- Accepting a subsidy promise without checking DCR modules, portal registration and eligibility.
- Ignoring roof shade, water leakage risk, wind loading or safe access for maintenance.
- Treating the inverter app’s estimated generation as a substitute for a written design and warranty.
- Paying for a battery without defining which circuits it will support and for how long.
- Assuming exported units are credited at the same rate as imported electricity.
- Signing before the complete equipment list, warranty documents and total installed price are recorded.
Frequently asked questions
Is a 3 kW rooftop solar system enough for a home?
It depends on monthly consumption, daytime load, roof conditions, local rules and the generation estimate. Compare your actual bills with a site-specific design rather than relying on a standard household-size chart.
Does rooftop solar work during a power cut?
A standard grid-tied inverter disconnects when the grid fails because of islanding protection. A correctly designed hybrid system with a suitable battery and backup circuit is needed for dependable backup.
Can an off-grid system receive PM Surya Ghar subsidy?
No. The published residential CFA guidelines exclude off-grid installations. Some grid-connected hybrid or behind-the-meter systems may be eligible subject to the relevant regulatory approvals and scheme conditions.
Is the ₹78,000 subsidy available to every household?
No. It is the maximum central CFA under the published general-state residential structure for eligible systems. Connection type, capex mode, DCR modules, portal application, vendor registration, technical compliance and DISCOM verification all matter.
Can I install more than 3 kW and still receive the full subsidy?
The published individual residential CFA structure provides support up to 3 kWp. Additional capacity beyond that does not attract additional central CFA under the stated structure, although the full plant may still be sized for your consumption.
What warranty should I ask for?
Ask separately for panel product and performance warranties, inverter warranty, battery warranty if applicable, mounting and workmanship coverage, and the vendor’s five-year comprehensive maintenance contract under the scheme. Read the exclusions and claim process.
Final verdict
A good rooftop solar purchase is a properly engineered system, not simply the largest panel count for the lowest quote. Decide whether you need grid savings only or backup as well, size the plant from bills and roof conditions, verify the exact components and compare metering rules. If you intend to claim PM Surya Ghar CFA, use the official portal, a registered vendor and eligible DCR modules, and obtain the technical and warranty documents before committing.